Tuticorin Thermal Power Station
Powering Tamil Nadu with strength and efficiency since 1979
Station Name
Tuticorin Thermal Power StationLocation
Thoothukudi Harbour Estate, 8 Km away from Thoothukudi Town, Tamil Nadu, and covers 160 hectares of land leased from Port Trust. It is connected by Road, Rail, and Seaways.Installed Capacity
5 x 210 MW = 1050 MWCommissioned
1979
Station
TUTICORIN THERMAL POWER STATIONLocation
Thoothukudi Harbour Estate, 8 Km away from Thoothukudi Town, Tamil Nadu, and covers 160 hectares of land leased from Port Trust. It is connected by Road, Rail, and Seaways.Year of Sanction:
The project was technically sanctioned in the year 1973.Construction Start Year:
Construction works commenced in the year 1976.Unit Capacity:
TTPS has five units, each with a production capacity of 210 MW. The total installed capacity is 1050 MW.Raw Water Source:
The raw water for the power station is obtained from the Tambiraparani river, supplied by the TWAD Board.Coal Source:
Coal is sourced from MCL Talcher & IB valley coal mines and transported by ship.Cooling Water Source:
The cooling water is sourced from the Tuticorin Harbour Basin.Unique Feature:
The 230 KV Indoor switch yard is a unique feature of TTPS.Contribution to Tamil Nadu Grid:
TTPS currently meets 5% of the Tamil Nadu grid demand.| Sl.No. | Particulars | Unit - I | Unit - II | Unit - III | Unit - IV | Unit - V |
|---|---|---|---|---|---|---|
| 1 | Date of First Synchronisation | 09.07.1979 | 17.12.1980 | 16.04.1982 | 11.02.1992 | 31.03.1991 |
| 2 | Month of Commencing Regular Generation | Jan-1980 | Jan-1981 | Nov-1982 | Jan-1994 | Mar-1995 |
| 3 | Date of First Coal Firing | 01.10.1980 | 20.01.1981 | 03.07.1982 | 08.06.1992 | 09.09.1993 |
| Sl.No. | Particulars | Unit - I | Unit - II | Unit - III | Unit - IV | Unit - V | Station |
|---|---|---|---|---|---|---|---|
| 1 | Maximum capacity reached on date | 03.03.80 | 04.03.81 | 03.12.82 | 28.01.93 | 18.12.93 | 07.01.94 |
| 2 | Maximum generation per day in MU reached on date | 5.28 (24.12.04) | 5.28 (04.02.02) | 5.28 (31.12.03) | 5.28 (04.02.02) | 5.28 (03.02.02) | 26.28 (23.02.04) |
| 3 | Maximum generation per month in MU reached during | 156.03 (Jan.'12) | 163.55 (Mar.'04) | 162.89 (Mar.'04) | 161.77 (Oct.'02) | 162.81 (Mar.'04) | 787.14 (Mar.'04) |
| 4 | Maximum PLF in % reached during | 101.8 (Apr.'03) | 104.7 (Mar.'04) | 104.4 (Feb.'04) | 104.5 (Feb.'04) | 104.7 (Apr.'04) | 101.9 (Apr.'03) |
| 5 | Maximum generation per year in MU and PLF % reached during | 1714.75 MU / 93.0% (2011-12) | 1757.22 MU / 95.3% (2003-04) | 1732.62 MU / 93.9% (2003-04) | 1755.68 MU / 95.4% (2001-02) | 1749.58 MU / 95.1% (2001-02) | 8282.14 MU / 90.04% (2012-13) |
| 6 | Maximum kwhr/kw/year reached during | 8165 (2011-12) | 8368 (2003-04) | 8251 (2003-04) | 8360 (2001-02) | 8331 (2001-02) | 7888 (2012-13) |
| 7 | Minimum oil used per unit generation (ml/kwhr) achieved during the month | 0.00 (Feb.'15) | 0.00 (Mar.'14) | 0.01 (Mar.'18) | 0.00 (Jan.'97) | 0.00 (Jun.'96) | 0.09 (Apr.'18) |
| 8 | Minimum auxiliary consumption % achieved during the month | 6.4% (May 2000) | 6.4% (Mar.'01) | 6.5% (Feb.'04) | 7.1% (Sep.'97) | 6.7% (Sep.'99) | 7.2% (Feb.'02) |
| 9 | Maximum number of days of continuous service | 92 (14.12.15 to 16.03.16) | 174 (11.09.12 to 05.03.13) | 115 (02.02.08 to 27.05.08) | 168 (24.01.13 to 12.07.13) | 232 (15.01.04 to 04.09.04) | 29 days 6 Hrs 55 Min (04.04.18 / 04.59 Hrs to 03.05.18 / 11.54 Hrs.) |