Tuticorin Thermal Power Station

Powering Tamil Nadu with strength and efficiency since 1979

Station Name

Tuticorin Thermal Power Station

Location

Thoothukudi Harbour Estate, 8 Km away from Thoothukudi Town, Tamil Nadu, and covers 160 hectares of land leased from Port Trust. It is connected by Road, Rail, and Seaways.

Installed Capacity

5 x 210 MW = 1050 MW

Commissioned

1979
TTPS

Station

TUTICORIN THERMAL POWER STATION

Location

Thoothukudi Harbour Estate, 8 Km away from Thoothukudi Town, Tamil Nadu, and covers 160 hectares of land leased from Port Trust. It is connected by Road, Rail, and Seaways.

Year of Sanction:

The project was technically sanctioned in the year 1973.

Construction Start Year:

Construction works commenced in the year 1976.

Unit Capacity:

TTPS has five units, each with a production capacity of 210 MW. The total installed capacity is 1050 MW.

Raw Water Source:

The raw water for the power station is obtained from the Tambiraparani river, supplied by the TWAD Board.

Coal Source:

Coal is sourced from MCL Talcher & IB valley coal mines and transported by ship.

Cooling Water Source:

The cooling water is sourced from the Tuticorin Harbour Basin.

Unique Feature:

The 230 KV Indoor switch yard is a unique feature of TTPS.

Contribution to Tamil Nadu Grid:

TTPS currently meets 5% of the Tamil Nadu grid demand.
Sl.No.ParticularsUnit - IUnit - IIUnit - IIIUnit - IVUnit - V
1Date of First Synchronisation09.07.197917.12.198016.04.198211.02.199231.03.1991
2Month of Commencing Regular GenerationJan-1980Jan-1981Nov-1982Jan-1994Mar-1995
3Date of First Coal Firing01.10.198020.01.198103.07.198208.06.199209.09.1993
Sl.No.ParticularsUnit - IUnit - IIUnit - IIIUnit - IVUnit - VStation
1Maximum capacity reached on date03.03.8004.03.8103.12.8228.01.9318.12.9307.01.94
2Maximum generation per day in MU reached on date5.28 (24.12.04)5.28 (04.02.02)5.28 (31.12.03)5.28 (04.02.02)5.28 (03.02.02)26.28 (23.02.04)
3Maximum generation per month in MU reached during156.03 (Jan.'12)163.55 (Mar.'04)162.89 (Mar.'04)161.77 (Oct.'02)162.81 (Mar.'04)787.14 (Mar.'04)
4Maximum PLF in % reached during101.8 (Apr.'03)104.7 (Mar.'04)104.4 (Feb.'04)104.5 (Feb.'04)104.7 (Apr.'04)101.9 (Apr.'03)
5Maximum generation per year in MU and PLF % reached during1714.75 MU / 93.0% (2011-12)1757.22 MU / 95.3% (2003-04)1732.62 MU / 93.9% (2003-04)1755.68 MU / 95.4% (2001-02)1749.58 MU / 95.1% (2001-02)8282.14 MU / 90.04% (2012-13)
6Maximum kwhr/kw/year reached during8165 (2011-12)8368 (2003-04)8251 (2003-04)8360 (2001-02)8331 (2001-02)7888 (2012-13)
7Minimum oil used per unit generation (ml/kwhr) achieved during the month0.00 (Feb.'15)0.00 (Mar.'14)0.01 (Mar.'18)0.00 (Jan.'97)0.00 (Jun.'96)0.09 (Apr.'18)
8Minimum auxiliary consumption % achieved during the month6.4% (May 2000)6.4% (Mar.'01)6.5% (Feb.'04)7.1% (Sep.'97)6.7% (Sep.'99)7.2% (Feb.'02)
9Maximum number of days of continuous service92 (14.12.15 to 16.03.16)174 (11.09.12 to 05.03.13)115 (02.02.08 to 27.05.08)168 (24.01.13 to 12.07.13)232 (15.01.04 to 04.09.04)29 days 6 Hrs 55 Min (04.04.18 / 04.59 Hrs to 03.05.18 / 11.54 Hrs.)
Thermal energy may be invisible, but its impact lights up every corner of our civilization
In the balance of power and the planet, gas-based thermal plants offer a lower-carbon bridge to the future
Smarter fuel use, stronger thermal efficiency
Upgraded plants, upgraded performance
Efficiency in every operation, power in every unit
Natural gas: a cleaner flame driving the engine of modern electricity

Explore Our Trusted Websites