North Chennai Thermal Power Station – II
Powering Tamil Nadu with strength and efficiency since 2014
Station Name
North Chennai Thermal Power Station-Stage-IILocation
Thiruvallur District, TamilnaduInstalled Capacity
2 x 600 MW = 1200 MWCommissioned
Unit I : 20-03-2014Unit II : 08-05-2014

Boiler (Make)
BHEL (Trichy)Type: Radiant, Reheat, Natural Circulation, Single Drum, Semi Outdoor
Capacity: 693.6 T/hr
Turbine (Make)
KWU (Germany), Designed by BHELType: Reaction-Tandem Compounding, Condensing Regenerative Cycle
Capacity: 210 MW
Generator
BHEL (Haridwar)Capacity: 210,000 KW / 247,000 KVA
Switch Yard
Indoor yard with 8 × 230KV feedersQuality Certification
IS/ISO 9001:2015 by BISLicense: QSC/L-6002651.7
Valid till: 31.12.2026
Station
North Chennai Thermal Power Station-Stage-IILocation
Thiruvallur District, TamilnaduCapacity (Including Units)
2 x 600 MWCost of Project
Rs. 4650 CroresDate of Commissioning
Unit I: 20-03-2014Unit II: 08-05-2014
Height of Chimney
275 MetresSwitchyard
Indoor Type / GISNo. of 400 KV Grid Feeders
Vallur Feeder-I / Vallur Feeder-II / Alamathy Feeder / Manali Feeder / S.V. Chatiram Feeder-I / S.V. Chatiram Feeder-IIPlant Area (Stage-II)
218 AcresAsh Dump Area
473.19 Acres (Stage I Ash dump area is being utilized by Stage II. There is no separate ash dyke area for Stage-II.)Employees Colony (Stage-I & II)
182.91 AcresSource of Cooling Water
Sea WaterMethod of Cooling
Once-through C.W. SystemCooling Water Requirement
99,000 M3/hrSource of Water for Process/Potable Water
TTRO / Desalination WaterRequirements of Water
18.0 MLDQuantity Requirement-Click for more detailsDesign Coal Requirement
3.76 Million Tonnes per YearTypes
Sub-Bituminous CoalLinked Coal Mines
Talcher Mines, IB Valley & Ranikanj Mines (Also Imported Coal from Indonesia)Gross Calorific Value
3855 Kcal/KgAsh Contents
40.4%Volatile Matter
27.6%Sulphur Content
0.26%HGI
55 HGIMoisture Content
12.1%Fixed Carbon
27.1%Type
HFO / LDONearest Service Outlet
Chennai / TondiarpetAvailable Storage Capacity
H.F.O: 1 x 2000 TL.D.O: 1 x 2170 T (Both NCTPS-I & II)
| Sl.No. | Particulars | Unit-I | Unit-II | Station |
|---|---|---|---|---|
| 1 | Maximum Capacity Reached on | 02.07.2014 / 629 MW | 18.10.2016 / 631 MW | 21.10.2016 / 1220 MW |
| 2 | Maximum Daily Generation in M.U Reached on Date | 01.04.2015 / 14.2757 MU | 24.03.2017 / 14.293 MU | 23.11.2023 / 28.175 MU |
| 3 | Maximum Daily PLF in % Reached on Date | 01.04.2015 / 99.14 % | 24.03.2017 / 99.26 % | 23.11.2023 / 97.83 % |
| 4 | Maximum Monthly Generation in M.U Reached during the month | 392.663 M.U / Mar'19 | 399.894 M.U / Mar'17 | 766.700 M.U / Apr'18 |
| 5 | Maximum Monthly PLF in % Reached during the month | 87.96 % / Mar'19 | 92.04 % / Apr'18 | 88.74% / Apr'18 |
| 6 | Maximum Monthly Kwhr/Kw/Year Reached during the month | 7930.23 / Feb'24 | 8062.53 / Apr'18 | 7928.54 / Feb'24 |
| 7 | Minimum Monthly Specific oil consumption (ml/Kwhr) achieved during the month | 0.00 ml/Kwhr / Aug'21, June'23 | 0.00 ml/Kwhr / Feb'23 | 0.002 ml/Kwhr / Feb'15 |
| 8 | Minimum Monthly Auxiliary consumption (%) achieved during the month | 5.73% / Mar'19 | 5.09% / Apr'18 | 5.58% / Apr'18 |
| 9 | Maximum Annual Generation during Financial Years in M.U | 3514.92 M.U (2015-16) | 3793.97 M.U (2014-15) | 6712.3260 M.U (2018-19) |
| 10 | Maximum Annual PLF in % during the Financial Years | 66.69% (2015-16) | 72.18% (2014-15) | 63.85% (2018-19) |
| 11 | Maximum Annual Availability Factor in % during the Financial Years | 89.06% (2015-16) | 92.7% (2014-15) | 77.80% (2015-16) |
| 12 | Maximum Annual Utility Factor in % during the Financial Years | 83.59% (2018-19) | 85.80% (2023-24) | 84.05% (2018-19) |
| 13 | Minimum Annual Specific oil consumption (ml/Kwhr) during the Financial Years | 0.661 (2018-19) | 0.61 (2021-22) | 0.675 (2021-22) |
| 14 | Minimum Annual Auxiliary consumption (%) during the Financial Years | 6.79% (2018-19) | 5.93% (2018-19) | 6.37% (2018-19) |
| 15 | Maximum No. of Days in continuous service | 130 Days (11.06.2015 to 18.10.2015) | 101 Days (24.01.2015 to 04.05.2015) | 40 Days (09.09.2015 to 18.10.2015) |
| 16 | Maximum Monthly Revenue achieved from sale of Ash | Rs. 379.698 Lakhs (March 2024) | ||
| 17 | Maximum Annual Revenue achieved from sale of Ash | Rs. 3220.28 Lakhs (2023-24) |