North Chennai Thermal Power Station – II

Powering Tamil Nadu with strength and efficiency since 2014

Station Name

North Chennai Thermal Power Station-Stage-II

Location

Thiruvallur District, Tamilnadu

Installed Capacity

2 x 600 MW = 1200 MW

Commissioned

Unit I : 20-03-2014
Unit II : 08-05-2014
NCTPS1

Boiler (Make)

BHEL (Trichy)
Type: Radiant, Reheat, Natural Circulation, Single Drum, Semi Outdoor
Capacity: 693.6 T/hr

Turbine (Make)

KWU (Germany), Designed by BHEL
Type: Reaction-Tandem Compounding, Condensing Regenerative Cycle
Capacity: 210 MW

Generator

BHEL (Haridwar)
Capacity: 210,000 KW / 247,000 KVA

Switch Yard

Indoor yard with 8 × 230KV feeders

Quality Certification

IS/ISO 9001:2015 by BIS
License: QSC/L-6002651.7
Valid till: 31.12.2026

Station

North Chennai Thermal Power Station-Stage-II

Location

Thiruvallur District, Tamilnadu

Capacity (Including Units)

2 x 600 MW

Cost of Project

Rs. 4650 Crores

Date of Commissioning

Unit I: 20-03-2014
Unit II: 08-05-2014

Height of Chimney

275 Metres

Switchyard

Indoor Type / GIS

No. of 400 KV Grid Feeders

Vallur Feeder-I / Vallur Feeder-II / Alamathy Feeder / Manali Feeder / S.V. Chatiram Feeder-I / S.V. Chatiram Feeder-II

Plant Area (Stage-II)

218 Acres

Ash Dump Area

473.19 Acres (Stage I Ash dump area is being utilized by Stage II. There is no separate ash dyke area for Stage-II.)

Employees Colony (Stage-I & II)

182.91 Acres

Source of Cooling Water

Sea Water

Method of Cooling

Once-through C.W. System

Cooling Water Requirement

99,000 M3/hr

Source of Water for Process/Potable Water

TTRO / Desalination Water

Requirements of Water

18.0 MLD

Quantity Requirement-Click for more detailsDesign Coal Requirement

3.76 Million Tonnes per Year

Types

Sub-Bituminous Coal

Linked Coal Mines

Talcher Mines, IB Valley & Ranikanj Mines (Also Imported Coal from Indonesia)

Gross Calorific Value

3855 Kcal/Kg

Ash Contents

40.4%

Volatile Matter

27.6%

Sulphur Content

0.26%

HGI

55 HGI

Moisture Content

12.1%

Fixed Carbon

27.1%

Type

HFO / LDO

Nearest Service Outlet

Chennai / Tondiarpet

Available Storage Capacity

H.F.O: 1 x 2000 T
L.D.O: 1 x 2170 T (Both NCTPS-I & II)
Sl.No.ParticularsUnit-IUnit-IIStation
1Maximum Capacity Reached on02.07.2014 / 629 MW18.10.2016 / 631 MW21.10.2016 / 1220 MW
2Maximum Daily Generation in M.U Reached on Date01.04.2015 / 14.2757 MU24.03.2017 / 14.293 MU23.11.2023 / 28.175 MU
3Maximum Daily PLF in % Reached on Date01.04.2015 / 99.14 %24.03.2017 / 99.26 %23.11.2023 / 97.83 %
4Maximum Monthly Generation in M.U Reached during the month392.663 M.U / Mar'19399.894 M.U / Mar'17766.700 M.U / Apr'18
5Maximum Monthly PLF in % Reached during the month87.96 % / Mar'1992.04 % / Apr'1888.74% / Apr'18
6Maximum Monthly Kwhr/Kw/Year Reached during the month7930.23 / Feb'248062.53 / Apr'187928.54 / Feb'24
7Minimum Monthly Specific oil consumption (ml/Kwhr) achieved during the month0.00 ml/Kwhr / Aug'21, June'230.00 ml/Kwhr / Feb'230.002 ml/Kwhr / Feb'15
8Minimum Monthly Auxiliary consumption (%) achieved during the month5.73% / Mar'195.09% / Apr'185.58% / Apr'18
9Maximum Annual Generation during Financial Years in M.U3514.92 M.U (2015-16)3793.97 M.U (2014-15)6712.3260 M.U (2018-19)
10Maximum Annual PLF in % during the Financial Years66.69% (2015-16)72.18% (2014-15)63.85% (2018-19)
11Maximum Annual Availability Factor in % during the Financial Years89.06% (2015-16)92.7% (2014-15)77.80% (2015-16)
12Maximum Annual Utility Factor in % during the Financial Years83.59% (2018-19)85.80% (2023-24)84.05% (2018-19)
13Minimum Annual Specific oil consumption (ml/Kwhr) during the Financial Years0.661 (2018-19)0.61 (2021-22)0.675 (2021-22)
14Minimum Annual Auxiliary consumption (%) during the Financial Years6.79% (2018-19)5.93% (2018-19)6.37% (2018-19)
15Maximum No. of Days in continuous service130 Days (11.06.2015 to 18.10.2015)101 Days (24.01.2015 to 04.05.2015)40 Days (09.09.2015 to 18.10.2015)
16Maximum Monthly Revenue achieved from sale of AshRs. 379.698 Lakhs (March 2024)
17Maximum Annual Revenue achieved from sale of AshRs. 3220.28 Lakhs (2023-24)
Thermal energy may be invisible, but its impact lights up every corner of our civilization
In the balance of power and the planet, gas-based thermal plants offer a lower-carbon bridge to the future
Smarter fuel use, stronger thermal efficiency
Upgraded plants, upgraded performance
Efficiency in every operation, power in every unit
Natural gas: a cleaner flame driving the engine of modern electricity

Explore Our Trusted Websites