North Chennai Thermal Power Station – I

Powering Tamil Nadu with strength and efficiency since 1994

Station Name

North Chennai Thermal Power Station – I

Location

Athipattu, Thiruvallur District, Tamil Nadu

Installed Capacity

3 × 210 MW = 630 MW

Commissioned

1994 – 1996
NCTPS1

Boiler (Make)

BHEL (Trichy)
Type: Radiant, Reheat, Natural Circulation, Single Drum, Semi Outdoor
Capacity: 693.6 T/hr

Turbine (Make)

KWU (Germany), Designed by BHEL
Type: Reaction-Tandem Compounding, Condensing Regenerative Cycle
Capacity: 210 MW

Generator

BHEL (Haridwar)
Capacity: 210,000 KW / 247,000 KVA

Switch Yard

Indoor yard with 8 × 230KV feeders

Quality Certification

IS/ISO 9001:2015 by BIS
License: QSC/L-6002651.7
Valid till: 31.12.2026

Station

NCTPS – I

Location

Athipattu, Thiruvallur, Tamil Nadu

Capacity

3 × 210 MW = 630 MW

Project Cost

Rs. 1792 Cr (ADB Funded)

Commissioned

U-I: 25-10-94
U-II: 27-03-95
U-III: 24-02-96

Area

549 Acres

Coal Source

Mahanadhi Coal Fields (via ship → Kamarajar Port)

Coal Transport

NCTPS I–III, MTPS-I (via rail)

Coal Handling

Unloaders: 2 × 2000 TPH
Stackers/Reclaimers/Wagon Loaders: 2000 TPH each

Rail Siding

22 KM (via Athipattu, Pudhunagar)

Coal Yard

ICHS: 240,000 MT
ECHS: 240,000 MT
SCR: 200,000 MT

Fuel Oil

HFO: 2 × 5260 T
HSD: 1 × 2170 T

Ash Dyke

Capacity: 40 LMT
Primary: 115 ha
Secondary: 15.5 ha

Chimney

275m RCC with 4m SS flue

Cooling Water

Sea Water – Once Through System

Raw Water

From CMWSSB
Req.: 3.5 MLD

1 – FY 1998–99

Peak Hour Generation: 4047.81 M.U.

Generation Level: 6425 Kwhr / Kw / Year

achievement: One shield and ₹6.42 Lakhs

2 – FY 1999–2000

Peak Hour Generation: 4691.43 M.U.

Generation Level: 7446 Kwhr / Kw / Year

achievement: One shield, Silver medal and ₹8.31 Lakhs

3 – FY 2000–01

Peak Hour Generation: 4579.107 M.U.

Generation Level: 7268 Kwhr / Kw / Year

achievement: Silver shield + Certificate for Meritorious performance, (2000–01 & 2003–04)

4 – FY 2001–02

Peak Hour Generation: 5049.771 M.U.

Generation Level: 8015 Kwhr / Kw / Year

achievement: Gold shield + Certificate for Outstanding performance, (2001–02 & 2002–03)

5 – FY 2002–03

Peak Hour Generation: 4818.306 M.U.

Generation Level: 7648 Kwhr / Kw / Year

achievement: Gold shield + Certificate for Outstanding performance, (2001–02 & 2002–03)

6 – FY 2003–04

Peak Hour Generation: 4685.604 M.U.

Generation Level: 7437 Kwhr / Kw / Year

achievement: Silver shield + Certificate for Meritorious performance, (2000–01 & 2003–04)

Sl.No.ParticularsUnit-IUnit-IIUnit-IIIStation
1Max. Capacity Reached on16.09.9510.11.9525.05.9613.08.96
2Max. Daily Generation in M.U Reached on Date5.285 MU / 26.12.065.283 MU / 26.12.065.285 MU / 26.12.0615.853 MU / 26.12.06
3Max. Monthly Generation in M.U Reached during the month160.329 MU / Dec’06157.846 MU / Jan’07157.975 MU / Dec’06472.553 MU / Jan’07
4Max. Monthly PLF in % Reached during the month102.62% / Dec’06101.49% / Feb’07101.13% / Feb’07101.50% / Feb’07
5Maximum Monthly Kwhr/Kw/Year Reached during the month8989 / Dec’068890 / Feb’078859 / Feb’078891 / Feb’07
6Min. Monthly Specific Oil Consumption (ml/Kwhr) Achieved during the monthNil / Aug’17Nil / Jul’12Nil / Dec’080.005 ml/Kwhr / Feb’19
7Min. Monthly Auxiliary Consumption (%) Achieved during the month7.59% / Jul’967.94% / Jun’047.19% / Dec’967.99% / Aug’96
8Maximum Annual Generation during Financial Years in M.U1755.450 MU (2012-13)1681.575 MU (2006-07)1759.330 MU (2008-09)5059.480 MU (2012-13)
9Maximum Annual PLF in % during the Financial Years95.43% (2012-13)91.41% (2006-07)95.64% (2008-09)91.68% (2012-13)
10Maximum Annual Availability Factor in % during the Financial Years96.90% (2012-13)93.18% (2001-02)96.41% (2008-09)93.65% (2001-02)
11Maximum Annual Utility Factor in % during the Financial Years99.23% (2006-07)99.08% (2007-08)99.20% (2008-09)98.98% (2008-09)
12Minimum Annual Specific Oil Consumption (ml/Kwhr) during the Financial Years0.51 (2007-08)0.57 (2006-07)0.31 (2011-12)0.63 (2012-13)
13Minimum Annual Auxiliary Consumption (%) during the Financial Years8.37% (2012-13)8.50% (2011-12)8.13% (2011-12)8.36% (2011-12)
14Maximum No. of Days in Continuous Service214 Days (26.11.2006 to 28.06.2007)127 Days (24.06.2006 to 30.10.2006)186 Days (22.10.2008 to 27.04.2009)70 Days (15.02.2009 to 27.04.2009)
15No. of Times Continuous Service > 100 Days Achieved Since Inception6 times: 2001-02, 2004-05, 2007-08, 2008-09, 2013-14, 2021-226 times: 2000-01, 2006-07, 2006-07, 2009-10, 2010-11, 2014-1513 times: 2004-05, 2005-06, 2008-09, 2009-10, 2009-10, 2010-11, 2011-12 , 2012-13, 2013-14, 2014-15, 2015-16, 2016-17--
16 All the Units of NCTPS-I had been continuously in service for 31 days from 19.03.2023 to 18.04.2023, the highest after 5 years.
(Previous: 30 days during 28.04.2018 to 27.05.2018)
Thermal energy may be invisible, but its impact lights up every corner of our civilization
In the balance of power and the planet, gas-based thermal plants offer a lower-carbon bridge to the future
Smarter fuel use, stronger thermal efficiency
Upgraded plants, upgraded performance
Efficiency in every operation, power in every unit
Natural gas: a cleaner flame driving the engine of modern electricity

Explore Our Trusted Websites