Mettur Thermal Power Station – II
Powering Tamil Nadu with strength and efficiency since 2013
Station Name
Mettur Thermal Power Station-IILocation
MetturInstalled Capacity
600 MWCommissioned
12.10.2013
Inland Thermal Power Station
MTPS-II is the Second Inland Thermal Power Station of TNPGCL.First 600 MW Plant
TPS-II is the first 600 MW plant of TNPGCL.Generation Per Day
14.40 MU.Cost of the Project
Rs 3550 CroresArea of MTPS-II
130 AcresDate of First Synchronisation
04.05.2012Date of Commercial Operation (COD)
12.10.2013MTPS-II achieved the target under PAT Cycle-III (2017–2020) by BEE, New Delhi and received 19568 Energy Saving Certificates for sale.
December 2023: All-time high revenue of ₹5.49 Crores by sale of ash.
FY 2023–24: Total ash sale revenue reached ₹46.51 Crores, a record high for MTPS-II.
| Sl.No. | Continuous Running Days | Date |
|---|---|---|
| 1 | 108 days | 06.08.14 to 22.11.14 |
| 2 | 134 days | 12.01.16 to 25.05.16 |
| 3 | 193 days | 03.10.16 to 15.04.17 |
| 4 | 205 days | 24.12.2018 to 17.07.2019 |