Mettur Thermal Power Station – II

Powering Tamil Nadu with strength and efficiency since 2013

Station Name

Mettur Thermal Power Station-II

Location

Mettur

Installed Capacity

600 MW

Commissioned

12.10.2013
MTPS2

Inland Thermal Power Station

MTPS-II is the Second Inland Thermal Power Station of TNPGCL.

First 600 MW Plant

TPS-II is the first 600 MW plant of TNPGCL.

Generation Per Day

14.40 MU.

Cost of the Project

Rs 3550 Crores

Area of MTPS-II

130 Acres

Date of First Synchronisation

04.05.2012

Date of Commercial Operation (COD)

12.10.2013

MTPS-II achieved the target under PAT Cycle-III (2017–2020) by BEE, New Delhi and received 19568 Energy Saving Certificates for sale.

December 2023: All-time high revenue of ₹5.49 Crores by sale of ash.

FY 2023–24: Total ash sale revenue reached ₹46.51 Crores, a record high for MTPS-II.

Sl.No.Continuous Running DaysDate
1108 days06.08.14 to 22.11.14
2134 days12.01.16 to 25.05.16
3193 days03.10.16 to 15.04.17
4205 days24.12.2018 to 17.07.2019
Thermal energy may be invisible, but its impact lights up every corner of our civilization
In the balance of power and the planet, gas-based thermal plants offer a lower-carbon bridge to the future
Smarter fuel use, stronger thermal efficiency
Upgraded plants, upgraded performance
Efficiency in every operation, power in every unit
Natural gas: a cleaner flame driving the engine of modern electricity

Explore Our Trusted Websites